Off we go to deliver the first load, got some water to transverse,
Made it through the water pretty easily,
Coming up on the lumber yard,
Made it to the first yard,
Had to go back to the first garage due to some damaged received on the way back to the log station,
Loaded up with another load and off we go
Refueled and good to go,
Passing the first lumber yard on my way to the second,
Stopped for a refuel
And we made it to the second yard, Both yards only need 2 points of logs now,
Got hung up on a few trees coming back,
Made it to the garage, I decided to get in a 6x6 and get a crane, The crane load spot is just off the paved road so way closer,
Got the 6x6 in place and ready to load logs,
Configured the 8x8 with the short log module and off we go,
Lined up and ready to get loaded,
Loading up the 8x8
After thinking I had enough logs I made a trip to the yard only to find out I did not, On the way back I received a lot of damage, I then figured out that you have to āsecureā the load,
At the refuel spot,
I loaded up another 6x6 with a repair module and a repair trailer, 1200 repair points and set off,
Made it to the spot to repair and refuel the 8x8
Made it to another refuel point on the way to the yard,
Made it to the far yard,
I left the 8x8 at the yard and fitted the repair 6x6 with the short log module and headed out,
Ready for logs,
Last load,
Load secured and ready to go,
Refueled and ready to go,
Coming up to the lumber yard,
Last load delivered!
And with that Seashore is done!
Next up I take a break and do some challenges to learn a bit more about the game, Stay tuned for more maps fun!